Colleyville Heritage High School
Bond Proposal
$28,644,194
Campus Items
- Asbestos Abatement
- HVAC Replacement and Repairs
- Kitchen Equipment Upgrades
- Site Improvements
- Repair concrete drives, parking and curbs
- Repair drainage
- Concrete bollards at entrances
- New sidewalk to enter competition fields
- Security Upgrades
- Add controlled vestibule entrance
- Additional access control at roll down gates
- Upgrade intercom system and add horns
- Replace digital radios
- Replace exterior and interior surveillance cameras
- Add emergency phone in shelter location
- Safety Upgrades
- Replace fire alarm system
- Carbon monoxide detectors
- New classroom door hardware to support emergency lockdown and comply with fire code
- Add gas, electric and water safety shut-off valves in science labs
- Accessibility Improvements
- Mechanical, Electrical and Plumbing Repairs
- Replacement Uniforms
- Dance
- Band
- Choir
- Library Upgrades
- New furniture, equipment and genius bar
- Renovations for new collaboration areas
- Fine Arts Upgrades
- Upgrading lighting and sound performance equipment
- Acoustic performance shell
- Athletics Upgrades
- Restroom partition replacement
- Replace locker room flooring with non-slip material
- Sand and repaint gym floors
- Tennis court netting and lighting
- Softball backstop net
- Rebuild baseball outfield fence and safety padding
- Replacement scoreboard equipment in gyms and stadium
- Cheerleading uniforms
- Multipurpose Activity Center
- New multipurpose space to be utilized by a variety of extracurricular activities to include an indoor field, restrooms and dressing area, offices, large meeting space, training room and weight room
District-Wide Items at This Campus*
- Classroom Upgrades
- New furniture
- Cabinet replacement
- Technology
- Replacement student and teacher mobile devices
- Replacement printers
- Classroom interactive devices
- Projectors and document cameras
- Classroom and office desktop computers
*(Costs not included in above total)