Grapevine Middle School
CLICK HERE FOR CONSTRUCTION UPDATES

Bond Proposal: $7,311,704

Classroom Addition (6)

Accessibility Improvements

HVAC Replacement and Repairs

Mechanical, Electrical and Plumbing Repairs

Kitchen Equipment Upgrade

Athletics Upgrades

Improve drainage on practice fields

Repair concrete footing on tennis court

Cheerleading uniforms

Site Improvements

Pavement repairs

Sidewalk repairs

Drainage repair at north practice fields

Library Upgrades

New furniture, equipment and genius bar

Renovations for new collaboration areas

Security Upgrades

New controlled vestibule entrance

Upgrade intercom system

Replace exterior and interior surveillance cameras

Add emergency phone in shelter location

Add panic gates with access control

Repair fencing along perimeters

Add concrete bollards around gas meter

Safety Upgrades

Carbon monoxide detectors

New classroom door hardware to support emergency lockdown and comply with fire code

Replace digital radios

Replace fire alarm panels

Replace access control interior doors to academic wings

Add access control to corridor doors near athletics

Automated External Defibrillator signage

Add gas, electric and water safety shut-off valves in science labs

Upgrade exhaust vents in science labs

Install non-slip material in locker rooms

Restroom Upgrades

Replace wooden restroom partitions

District-Wide Items at this Campus: (Costs not included in above total)

Classroom Upgrades

New furniture

Cabinet replacement

Technology

Replacement student and teacher mobile devices

Replacement printers

Classroom interactive devices

Projectors and document cameras

Classroom and office desktop computers

©2016 Grapevine-Colleyville ISD